Start a project Call the office
Beckman Construction Beckman Construction
A residential construction project

Residential · Dallas

Residential construction

A house is priced from the rooms, the finishes, and whether the family stays.

New homes
From the drawings
Additions
Tied to the existing house
Allowances
Named, or not in the price
Inspections
Scheduled by the lead

About this work

Residential construction at Beckman Construction means a house: a new home, an addition, or a renovation of a home people may still live in. The proposal names drawings, allowances, inspections, and exclusions. Finish quality is checked while the work is open, not explained on the last afternoon.

Scope sheet

A residential scope, line by line

Typical contents of a house proposal. Your site’s list is the one you accept.

Part of the house What the proposal should say A common gap
Foundations and structure New footings, the tie-in to the existing house, and who engineers it “Match existing” with no detail
Enclosure Roof, windows, exterior doors, and weather barrier in the drawings Windows listed as an allowance with no count
MEP rough-in Electrical, plumbing, and HVAC zones that are in the price A future bath roughed in but not listed
Insulation and drywall Levels and the rooms included The garage treated as living space by assumption
Kitchens and baths Cabinets, counters, fixtures as specified or as a dollar allowance An allowance with no product range
Floors and paint Material, rooms, and the number of coats or the product “Owner choice” with no cap
Site Drive, flatwork, and protection of landscaping the owner is keeping Damage to the yard left unstated
Closeout Inspections, punch list, warranties, and as-agreed drawings Keys only

How a job of this kind moves

  1. 01

    Walk the house

    Address, how the family will live during the work, and the drawings or a measured sketch.

  2. 02

    Fix allowances

    If a counter or a floor is not chosen, the dollar amount and the range are written. An open allowance is not a price.

  3. 03

    Build in order

    Structure, rough-in, insulation, drywall, then finishes. Reviews happen before the work is covered.

  4. 04

    Inspect and hand over

    The inspections named in the contract, then a punch list that is closed or dated.

Details that belong on this page

Living in the house

If the family stays, the proposal names the rooms that remain usable, how floors and furniture are protected, and which days are noisy. A kitchen outage is a date, not a surprise.

Additions

The new work has to meet the existing house: floor levels, roof, and the services that already run through the wall you are opening. That tie-in is scoped, not discovered.

Who decides a conflict

When the drawing and the house disagree, the project lead records the difference before extra work proceeds. The owner accepts the cost and the time in writing.

What you keep

The accepted scope, the changes, appliance and finish warranties you are entitled to, and the inspection record.

Straight answers

Can we stay in the house?

When the proposal says so. It lists the rooms that stay in use and the protection of those rooms. Some structural phases still require a night away. That is written, not negotiated on the morning of.

Do you choose our finishes?

No. You select them, or you accept a named allowance. The allowance states the amount. Going over it is a change.

Who calls the inspector?

The project lead schedules the inspections the contract names. You are told when an inspection needs the house clear.

Dallas office

Bring the address. We will write the scope.

Beckman Construction prices the building in front of us. We do not publish a rate card, and we do not start work on a verbal price.

Request a consultation