Staying open
An occupied office or shop is phased. Staff should know which door to use the next morning. That path is in the plan.
Commercial · Dallas
The business hours decide the schedule, not the other way around.
About this work
Commercial construction here means workplaces, retail, and mixed-use space. The contract states the hours work may be loud, the entrance the public still uses, and the date each area is handed back. Landlord rules are read before demolition, not after a complaint.
Scope sheet
A build-out is not “the third floor.” It is a list.
| Item | In a complete proposal | Often missed |
|---|---|---|
| Area | Square footage and the rooms, with a drawing reference | A suite number only |
| Demolition | What is removed and what stays, including ceilings | Above-ceiling services assumed |
| Partitions and doors | Rated walls and the door schedule | Borrowed landlord doors |
| MEP | Power, lighting, HVAC zones, and plumbing fixtures in the price | Low-voltage and fire alarm left unspoken |
| Finishes | Floor, paint, ceiling, and millwork as specified or allowed | Furniture treated as construction |
| Hours | Nights, weekends, or business hours, and noisy work | “Coordinate later” |
| Access | Freight elevator, loading dock, and the public entrance that stays open | A dock that the landlord has not released |
| Closeout | Punch by area, inspections, attic stock if specified, as-built notes | One walkthrough for the whole floor |
01
What must stay open, the landlord’s rules, and the date the business needs the area.
02
Demolition, partitions, MEP, and finishes that are drawn. Exclusions are as visible as inclusions.
03
Each phase has a start, protection of the next suite, and a hand-back date.
04
The person named in the contract accepts the area against that phase’s punch list.
An occupied office or shop is phased. Staff should know which door to use the next morning. That path is in the plan.
Night and weekend work is in the proposal only when the building allows it. It is not added free because the day became inconvenient.
The proposal says which side owns the riser, the HVAC unit, and the fire alarm. Work on the landlord’s system is not assumed.
Desks, network switches, and security head-end are in the price only when listed. Otherwise they are the tenant’s vendors, scheduled around our hand-back.
Yes when the proposal phases the work and names the area that remains in use. A full-floor gut is a different scope, and the proposal will say the floor is closed.
When the contract assigns that coordination. Building access, hot work, and freight-elevator bookings are written before mobilization.
The date a defined area is returned to the business: punch items for that area closed or dated, and the business able to use it as the scope described.
Dallas office
Beckman Construction prices the building in front of us. We do not publish a rate card, and we do not start work on a verbal price.