Four kinds of building. One way of writing the job down.

Office
Dallas, TX 75201
Sectors
Four, one lead
Price
Written scope
Start
After acceptance

About this work

Beckman Construction delivers four kinds of work from the Dallas office: new and renovated homes, commercial buildings and fit-outs, industrial facilities, and interior renovation of buildings that stay in use. Project management and durability decisions run through all four. They are not a separate product.

Scope sheet

What is actually priced

A capability is a type of building. The proposal prices a specific scope on a specific address.

Capability Usually included once scoped Named separately Decided before mobilization
Residential Structure, enclosure, MEP rough-in, specified finishes Cabinet, counter, and flooring allowances if not selected Which rooms stay occupied
Commercial Demolition of the listed area, build-out, listed MEP Landlord work, furniture, low-voltage if excluded Hours the business stays open
Industrial The defined area, slab or steel in the drawings, listed power Process equipment the owner installs Shutdown dates and access
Renovation and fit-out Selective demolition, partitions, listed finishes Unknown conditions behind finishes Protection of adjacent areas
Project management One lead, schedule, change log, closeout file Not a standalone hourly retainer Who approves a field change
Durable construction Materials specified for the use and the maintenance the owner accepts A green label with no service life What must last, and what is an allowance

How a job of this kind moves

  1. 01

    Name the building

    House, workplace, facility, or an interior that stays occupied. Send the address and any drawings.

  2. 02

    Separate scope from wish

    Inclusions, exclusions, and allowances are listed. An item that is not listed is not in the price.

  3. 03

    Build against that file

    Trades are sequenced. A change records cost and time before the extra work proceeds.

  4. 04

    Hand over the record

    Inspections named in the contract, a punch list that is closed or dated, and the papers the owner keeps.

Details that belong on this page

One lead

The person who owns the scope also owns field questions. You are not passed between a salesperson and a site that has never seen the proposal.

Changes in writing

A text message is not a change. The record states what is added or removed, what it costs, and how the finish date moves.

Quality while the work is open

Framing, rough-in, and finishes are reviewed before they are covered. The last week is for punch items, not for discovering the structure.

Dallas office

The company is at 1700 Pacific Ave, Dallas, TX 75201. A consultation is a review of scope. It is not a contract until you accept the written proposal.

Straight answers

Do you publish square-foot prices?

No. A house addition, a retail floor, and a plant bay do not share a rate. The proposal prices the drawings, the allowances, and the constraints on that site.

Can one contract cover more than one of these?

Yes, when the proposal says so. A commercial renovation is both commercial work and a fit-out. The scope still lists each area.

When does work start?

After the written scope, schedule, and price are accepted, and after the permits the contract assigns are in place.

Dallas office

Bring the address. We will write the scope.

Beckman Construction prices the building in front of us. We do not publish a rate card, and we do not start work on a verbal price.

Request a consultation